Skip to content

Fix CI after EDR removal: update smoke checks + bot demo paths; remov… #9

Fix CI after EDR removal: update smoke checks + bot demo paths; remov…

Fix CI after EDR removal: update smoke checks + bot demo paths; remov… #9

Triggered via push March 3, 2026 01:08
Status Failure
Total duration 14s
Artifacts

ci.yml

on: push
Matrix: Demo Pipeline Smoke Test
Fit to window
Zoom out
Zoom in

Annotations

6 errors
Demo Pipeline Smoke Test (3.11)
Process completed with exit code 1.
Demo Pipeline Smoke Test (3.10)
The strategy configuration was canceled because "smoke-test._3_11" failed
Demo Pipeline Smoke Test (3.10)
Process completed with exit code 1.
Demo Pipeline Smoke Test (3.12)
The strategy configuration was canceled because "smoke-test._3_11" failed
Demo Pipeline Smoke Test (3.12)
The operation was canceled.
Lint
Process completed with exit code 1.