Skip to content

Latest commit

 

History

History
19 lines (14 loc) · 1005 Bytes

File metadata and controls

19 lines (14 loc) · 1005 Bytes

Changelog

2026-06-24

Removed

  • Removed stale docs/claude-development files that described legacy Google Drive API resume delivery, GitHub activity integrations, AI assistant/chatbot sections, Lighthouse score claims, and old phase-based development notes.

2026-06-20

Changed

  • Repositioned the portfolio around Melbourne full-stack software engineer roles.
  • Reworked the hero, recruiter snapshot, working style, experience, skills, projects, contact and SEO copy to match the 2026 resume.
  • Replaced self-rated skills, Lighthouse metrics and weak quick-stat cards with evidence-led engineering capability areas.
  • Rebuilt projects as three flagship case studies plus compact supporting builds to reduce tutorial/clone dilution.
  • Removed stale AI assistant and legacy blog/brand/GitHub/reference sections from the main portfolio flow.

Removed

  • Removed the floating navigation UI that obscured mobile content.
  • Removed obsolete Lighthouse score components and animation hook.